Australia's data center electricity demand is projected to surge 7x to 34 TWh by 2035-36, reaching 13% of national grid consumption as AI drives

The energy market operator has assessed the grid as national power use is set to increase 40 per cent over a decade.

Data centre power demands and ongoing renewables delays could threaten Australia’s ability to keep the lights on over the next decade.