Annual data centre capex rises from $800bn to $1.8tn by 2050 in PwC’s modelling, with the US taking 48% and chips displacing construction as the driver.

Power constraints are driving significant double-digital growth for critical infrastructure vendors and their channel partners as AI data center construction accelerates.

Power constraints are driving significant double-digital growth for critical infrastructure vendors and their channel partners as AI data center construction accelerates.