Chennai Corporation Commissioner G.S. Sameeran inspected and reviewed the ongoing stormwater drain construction work on M.R.H. Road under Madhavaram Zone and the desilting work in the Puzhal surplus water canal on Saturday.
| Photo Credit: Special Arrangement
Greater Chennai Corporation (GCC) Commissioner G.S. Sameeran inspected precautionary works taken in Manali and Madhavaram zones on Saturday, ahead of the Northeast monsoon.In Madhavaram Zone, he inspected the stormwater drain work under way on the Madhavaram-Red Hills Road in Ward 24 and desilting work in the Puzhal surplus water channel. He also inspected the point where the surplus water channel from Ambattur and Korattur lakes joins near Sri Balaji Nagar Third Main Road, according to a press release.In Manali Zone, he inspected the Puzhal surplus water channel near the CPCL bottle bridge and Amullavoyal bridge in Ward 18. He instructed officials to remove the water hyacinth and vegetation and undertake desilting work in the channel, the release added.Officials from the GCC, Chennai Metropolitan Water Supply and Sewerage Board, Water Resources Department, Public Works Department and the Highways Department were present.NDRF personnel explain rescue measures






