The race for AI has caused Big Tech to turn to natural gas, as the traditional fossil fuel can provide dispatchable energy day and night.

Gas turbine backlogs stretching to 2031 threaten AI data center expansion as US power demand is set to double by 2027, with prices up 195% since

There’s no clearer sign of the data center boom than rampant gas projects that have been proposed or that are already under construction.