Storia: Earlier in 2026, United Utilities sent 44-ton tunnel borer Lily beneath Knutsford to build a 1.1-mile stormwater tunnel. Now, the finished system will hold 5.5 million liters of rainwater without closing the high street — Warptech Lab News