PINGTUNG, TOO:

The Yilan HSR line is to terminate at Nangang Station, while a line is to connect Kaohsiung’s Zuoying HSR Station to a planned station in Lioukuaitso

By Chung Li-hua and Hollie Younger / Staff reporter, with staff writer and CNA

Add TT as Preferred Source

Premier Cho Jung-tai (卓榮泰) yesterday officially approved a 60.6km extension of the high-speed rail (HSR) system to connect Taipei’s Nangang HSR Station with Yilan County, cutting travel time to about 28 minutes — a significant reduction compared with the Taiwan Railway Corp line.The project is expected to cost NT$352.175 billion (US$10.91 billion), with construction projected to be completed 11 years after final approval is received, or by 2037.The Yilan HSR line would run from the station in Nangang District (南港) through New Taipei City’s Sijhih (汐止), Pingsi (平溪), Shuangsi (雙溪) and Gongliao (貢寮) districts, before entering Yilan in Toucheng Township (頭城), passing through Jiaosi Township (礁溪) and terminating at a new HSR station, the ministry said.