Most MVP timelines are not lost to writing features. They are lost to deciding things that did not need deciding, and to redoing setup that should have been standard.
July 13, 2026
When a build runs long, the instinct is to blame the amount of code. That is almost never where the time went. We have shipped enough first versions to know that the schedule is rarely lost to writing features. It is lost to three quieter things: decisions that were never actually made, setup that gets rebuilt from scratch, and rework caused by scope that was never sharp. Compressing an MVP build is not about typing faster. It is about refusing to pay those three taxes again.
Where the weeks actually go
Watch a first build closely and the feature code is the small part. The weeks drain into everything around it. Choosing a stack. Arguing about folder structure. Wiring authentication. Setting up continuous integration. Configuring hosting and pointing a domain at it. Deciding on an analytics tool. Redoing the deploy after it breaks the first time. And then, near the end, rebuilding a feature because nobody wrote down what "MVP" meant, so two people held two different versions of it in their heads.