Energy
Key Facts
—The cargo. ECA LNG Phase 1, at Ensenada in Baja California, loaded and shipped its first cargo, bound for Asia.
—The owners. Sempra Infrastructure (NYSE: SRE) operates the plant; TotalEnergies (NYSE: TTE) holds 16.6%.
—The plant. A single liquefaction train with a nameplate capacity of 3.25 Mtpa, fed by American gas piped from the Permian Basin.








