Risk-Based Prioritization: The Context Factor
Most companies only look at the standard (Base) score of a CVE. However, a real risk model should consider 3 key parameters:
Base Metrics : The intrinsic, unchanging characteristics of the vulnerability (e.g., is it exposed to the internet or not).
Temporal Metrics : The current state of the threat (e.g., is there a ready-made exploit code that is actively used by hackers?).
Environmental Metrics : The context of your infrastructure.













