Rake loading to the power sector increases to 444 on September 6, reflecting a 20% rise in four days.

Rake loading to the power sector increases to 444 on September 6, reflecting a 20% rise in four days.

Government boosts coal rake loading by 20% to address low stock levels at thermal plants amid rising demand.