Even this limited capacity is not being fully utilised. The 100-KLD faecal-sludge co-treatment facility at the 345-MLD (million litres per day) Bharwara sewage treatment plant (STP) has struggled to receive adequate sludge, with tankers often unloading at nearby sewage-pumping stations instead of travelling to the designated facility.