Designs for two double-decker flyovers in Pune have been finalized, aiding the Metro extension. Cost estimated at ₹404 crore; PMC must confirm funding.

Designs for two double-decker flyovers in Pune have been finalized, aiding the Metro extension. Cost estimated at ₹404 crore; PMC must confirm funding.

PMC’s decision to build separate pillars for Metro, HCMRT at Dandekar Bridge Chowk, despite Maha-Metro saying both need a double-decker, has cast doubt on metro extension to…