₹10,700-crore proposed upgrade may redefine Lucknow airport
At the heart of the expansion is the New Integrated Terminal Building (T3). The proposed terminal has a Phase-I built-up area of over 1.15 lakh sq m, with another 33529.88 sq m planned in Phase II