Storia: In 2025, Hampton, New Hampshire, completed a $4.3 million drainage project using a repurposed pump station. 1 year later, residents estimated flooding had fallen 75%, transforming a flood-prone neighborhood — Warptech Lab News
In 2025, Hampton, New Hampshire, completed a $4.3 million drainage project using a repurposed pump station. 1 year later, residents estimated flooding had fallen 75%, transforming a flood-prone neighborhood
Hampton, New Hampshire, has successfully completed a $4.3 million drainage upgrade, significantly reducing flooding by 75% in a once flood-prone neighborhood, thanks to new drainage pipes, a repurposed pump station, and a monitoring system.