Heavy rainfall and a cloudburst caused massive landslides on the Thannamandi-DKG-Bufliaz Road. This vital route connecting Rajouri and Poonch districts remains closed for traffic after thirteen days. Vehicles are currently being diverted through the Bimber Gali route to avoid risks. Site engineers anticipate reopening the damaged road within two days. Locals urge authorities to manage damaged stretches and consider tunnel construction.