A practical, ongoing account of bringing a multi-terabyte production database back under control: cost, performance, and size.

A practical, ongoing account of bringing a multi-terabyte production database back under control: cost, performance, and size.

From 32 vCores to 16 (so far): calming an uneven baseline first, then going after the spikes — without adding hardware.