The vessel will remain in the dock for the next 10 days while specialist teams carry out maintenance, repairs and statutory inspections required for its continued operation.

The vessel will remain in the dock for the next 10 days while specialist teams carry out maintenance, repairs and statutory inspections required for its continued operation.

South Africa’s Transnet National Ports Authority (TNPA) reports that it has successfully docked a 228-m oil tanker at the Port of Durban’s historic Prince Edward Graving Dock,…