Gurugram is set to revive its long-delayed waste-to-energy (WTE) project after the city’s first scientific study of fresh municipal solid waste found that nearly 85% of the 1,100 tonnes of garbage generated daily can be scientifically processed instead of being dumped in landfills

The tribunal has sought a four-week timeline to stop fresh dumping and clear legacy waste, while MCG says waste transport is a temporary measure.

Gurugram is set to revive its long-delayed waste-to-energy (WTE) project after the city’s first scientific study of fresh municipal solid waste found that nearly 85% of the 1,100…