The three projects include the 53-kilometre six-lane road between Kharadi junction and Shirur bypass, which is the first phase of the 246 km long Pune-Sambhajinagar greenfield expressway, 31.5 km road between Hadapsar and Yavat, and 53.2 km between Talegaon-Chakan-Shikrapur.

The three projects include the 53-kilometre six-lane road between Kharadi junction and Shirur bypass, which is the first phase of the 246 km long Pune-Sambhajinagar greenfield…

The corporation will implement three major road widening projects — the 53.4-km Kharadi Junction-Shirur road, the 31.5-km Hadapsar-Yavat road, and the 53.2-km…