Polish renewables company Onde (WSE:OND) has signed a contract to build a 300-MW/1,200-MWh battery energy storage system (BESS) in Poland for a unit of the R.Power group, the two companies announced.

Poland's Ministry of Energy and utility Tauron Polska Energia have signed a letter of intent to cooperate in the construction of the 767 MW/3.1 GWh Roznow pumped-storage project.

Polish renewables company Onde (WSE:OND) has signed a contract to build a 300-MW/1,200-MWh battery energy storage system (BESS) in Poland for a unit of the R.Power group, the two…

German energy trader Entrix has signed an agreement with UK-based renewable energy developer Low Carbon to optimise a standalone 8.8-MW/17.6-MWh battery storage project in Poland,…

EDF power solutions Polska and Eurus Energy Europe BV have finalised their joint venture for the development, construction and operation of a 120 MW/280-MWh battery storage…