Projections show each hour 400 commercial vehicles could cross the new span between Detroit and Windsor, Ontario, originally scheduled to debut last month.

An opening ceremony was scheduled for June, but it was postponed indefinitely to give Washington and Ottawa time to resolve a dispute.

The 1.5-mile-long bridge, which spans the Detroit River and connects the Motor City with Windsor, Ontario, is expected to open on July 27.