Argentina has awarded contracts for 700.5 MW of battery energy storage system (BESS) capacity across 20 projects nationwide under the AlmaSADI tender, maintaining the 700-MW target despite being inundated with bids.

Por medio de la resolución 155/2026 de la Secretaría de Energía, el Ejecutivo informó los resultados de la licitación “Alma SADI”. Cinco empresas alcanzaron la instancia final…

Argentina has awarded contracts for 700.5 MW of battery energy storage system (BESS) capacity across 20 projects nationwide under the AlmaSADI tender, maintaining the 700-MW…