Following a Delhi-Dehradun Expressway cave-in, NHAI has suspended key personnel and issued show-cause notices. The incident, attributed to waterlogging after rains and issues with a drainage system, occurred on July 1, 2026. Local resistance reportedly hindered the permanent drainage setup. Restoration is complete, and an interim drain is being built to prevent future occurrences on this vital corridor.

A section of the Delhi-Dehradun Expressway caved in after heavy rains, raising concerns about construction quality and drainage issues.

Following a road surface cave-in on the Delhi-Dehradun Economic Corridor, the National Highways Authority of India has initiated disciplinary action. A show-cause notice has been…