Following a road surface cave-in on the Delhi-Dehradun Economic Corridor, the National Highways Authority of India has initiated disciplinary action. A show-cause notice has been issued to the project director, key officials suspended, and the contractor faces debarment. The incident, attributed to water stagnation and delayed drainage work due to local issues, has drawn criticism. NHAI is implementing interim drainage solutions while permanent infrastructure is addressed.

Just 79 days after its inauguration, the Rs 12,000 crore Delhi-Dehradun Expressway is reportedly riddled with large potholes, sparking outrage online. Videos of the damaged road…

A section of the Delhi-Dehradun Expressway caved in after heavy rains, raising concerns about construction quality and drainage issues.

Following a road surface cave-in on the Delhi-Dehradun Economic Corridor, the National Highways Authority of India has initiated disciplinary action. A show-cause notice has been…