Congressional Democrats are calling for investigations into renovations at the Lincoln Memorial Reflecting Pool, as the ongoing drama over the president’s problem-plagued, $16 million rehabilitation project continues to roil the capital

Costly Reflecting Pool revamp under fire amid algae bloom and disputed vandalism claims

U.S. Attorney Jeanine Pirro vows to fully prosecute those vandalizing the Lincoln Memorial Reflecting Pool amid ongoing renovation issues.

His involvement elevates scrutiny of a multimillion-dollar renovation project that has faced repeated setbacks since completion.

U.S. Attorney Jeanine Pirro said several citations have been issued to individuals accused of vandalizing the pool...

The Lincoln Memorial Reflecting Pool on Washington's National Mall is set to be drained again for repairs after algae and peeling paint appeared just weeks after a $14.7-million…

President has been blaming everything from vandals with chemicals to purposeful cutting for what he now calls a 300-foot ‘slit’ in the spray-painted surface coating done by no-bid…

La obra frente al Lincoln Memorial, proyectada como símbolo del 250º aniversario, exhibe fallas tempranas y episodios policiales, mientras autoridades ordenan nuevos drenajes y…

The reflecting pool on Washington's National Mall will have to be drained again after algae and peeling paint appeared weeks after it was renovated.

US president threatens prison for anyone seeking to damage one of his signature renovation projects.

Historical records show challenges at the Lincoln Memorial Reflecting Pool since the project design began.

Stay up to date with notifications from The IndependentNotifications can be managed in browser preferences.Jump to contentThank you for registeringPlease refresh the page or…

The Lincoln Memorial Reflecting Pool, newly renovated at a cost of $14m, is set to be drained again just weeks after reopening. The six-week-long project saw the pool drained…

El histórico estanque frente al Lincoln Memorial será drenado por nuevas fallas en el revestimiento, brotes de algas y acusaciones de vandalismo, mientras las autoridades…

The project now has a $16 million price tag and faces new scrutiny, vandalism accusations and a desired July Fourth completion date.

Rep. Robert Garcia, D-Calif., sent letters to Curtis E. Wood of Atlantic Industrial Coatings, LLC, and John Cafaro of Green Water Solutions, LLC, demanding answers by July 8.

WASHINGTON — The saga over the Lincoln Memorial Reflecting Pool took a turn as U.S. President Donald Trump said Tuesday that six people have been a...

The saga over the Lincoln Memorial Reflecting Pool took a turn as President Donald Trump said Tuesday that six people have been arrested over recent damage. The president’s…

Green Water Solutions and Atlantic Industrial Coatings received no-bid contracts from the National Park Service to renovate the pool.

The top Democrat on the House Oversight Committee sent letters Wednesday to the contractors overseeing the renovation at the Reflecting Pool on the National Mall.

Stay up to date with notifications from The IndependentNotifications can be managed in browser preferences.AllNewsSportCultureLifestylePresident Donald Trump attributed issues…