Impressive renewable-energy advances were graphically displayed by coal major Exxaro during its Capital Day on Monday, June 22. The first was a wind turbine involving 600 m3 of concrete in a 25 m excavation, elevated by a 15 t steel centre on a 60 t steel base, and the second a huge solar plant supplying green electrons. (Also watch attached Creamer Media video.)