In its longest combination (up to 198+ 8m), the new crane handles a maximum payload of 192 tons at extreme heights. This model reduces setup and dismantling time to two or three days—roughly half the time required by standard cranes in its class. In addition, it delivers fuel savings of 10 to 15% thanks to its Global Power Control Technology.