Residents of Spring Village in St Catherine now have a new bridge, which will ensure safe and reliable access to schools, jobs and emergency services, and strengthen connections with adjoining communities.The structure, built under the Government’s Accelerated Bridge Programme at a cost of $250 million, was officially opened recently by Prime Minister, Dr Andrew Holness.It replaces the previous 150-year-old bridge, which was closed by the National Works Agency (NWA) in September 2022 after concerns arose about its structural integrity.