CHN Energy has completed construction of a 400 MW solar-hydrogen-storage project in Jiangsu, combining coastal PV, battery storage and green hydrogen production in a single integrated system. The project, which includes a 60 MW/120 MWh battery and a hydrogen facility producing 482 tons annually, is expected to begin full operations after hydrogen commissioning in August 2026.