Solar Energy Corp. of India (SECI) has invited bids for the development of 1.2 GW of interstate transmission system (ISTS)-connected renewable energy projects coupled with energy storage systems (ESS), aimed at delivering 4,800 MWh (1200 MW x 4 hours) of assured peak power daily.