The new 737 Max final assembly line in Everett, Washington, will serve as a catalyst for increasing Max production to 52 jets per month.

The new 737 Max final assembly line in Everett, Washington, will serve as a catalyst for increasing Max production to 52 jets per month.

A new assembly line opening July 6 in Everett, Washington, is expected to push output to 52 jets a month next year