The approved portfolio includes about 3.8 GW of new capacity, anchored by 2,088 MW of gas generation, along with 1,100 MW of wind, 189 MW of solar and 472 MW/1.9 GWh of battery storage.
The approved portfolio includes about 3.8 GW of new capacity, anchored by 2,088 MW of gas generation, along with 1,100 MW of wind, 189 MW of solar and 472 MW/1.9 GWh of battery…