The UAE’s planned second Fujairah, or West-East, pipeline marks a major shift in Gulf energy security and export strategy. It matters not only because it reduces dependence on the Strait of Hormuz,…

The planned new pipeline will double Adnoc’s crude export capacity through the port of Fujairah, bypassing the Strait of Hormuz.

The United Arab Emirates is planning to fast-track construction of a west-east pipeline that would bypass the Strait of Hormuz, opening in 2027.

West-East Pipeline to double oil export capacity via FujairahNew pipeline expected to be operational by 2027Strait of Hormuz’s effective closure has boosted energy prices ABU...

Pipeline would allow the UAE to export nearly all of its pre-war volumes as it bypasses the Strait of Hormuz

The UAE is to fast-track construction of a new oil pipeline bypassing the Strait of Hormuz, official media said on Friday, after the Middle East war crippled exports through the…

The UAE’s planned second Fujairah, or West-East, pipeline marks a major shift in Gulf energy security and export strategy. It matters not only because it reduces dependence on the…

Development of polyolefins infrastructure on the east coast would ensure export continuity

ADNOC’s West-East pipeline to bypass the Strait of Hormuz is nearly 50% complete, boosting UAE oil export security and doubling Fujairah capacity by 2027.

The UAE has redirected some oil exports through an existing pipeline to Fujairah, which has a maximum capacity of 1.8 million barrels per day.