Spanish developer and IPP Zelestra has energised its 1GWh battery energy storage system (BESS) in the Atacama Desert in Chile.

A total of 4.5GW/12.8GWh of large-scale BESS capacity when into operation last month, with Asia and South America showing strong figures.

Spanish developer and IPP Zelestra has energised its 1GWh battery energy storage system (BESS) in the Atacama Desert in Chile.