Emma Reynolds came unstuck over questions about the cost and location of the flagship infrastructure scheme

Work on the Lower Thames Crossing is expected to begin in 2026 and finish by 2032.

Emma Reynolds came unstuck over questions about the cost and location of the flagship infrastructure scheme