Both projects were built as solar-plus-storage hybrids, with BESS Libelula co-located with a solar farm in the Santiago Metropolitan region and BESS Los Loros set at a solar site in the Atacama region. Together, the batteries represent an investment of USD 283 million (EUR 243.9m), the company said on Friday.BESS Libelula, located in the municipalities of Colina and Tiltil about 40 kilometres (25 miles) north of Santiago, has 203 MW of maximum gross power and 1,034 MWh of storage capacity. The system consists of 208 lithium-ion battery containers and can discharge for five hours.The site also includes a 140-MW solar photovoltaic plant with 245,560 panels mounted on Nexpower’s NX Horizon low-carbon trackers. The solar plant has been fully energised and is progressing through the process of obtaining commercial operation approval, while the BESS is already operating commercially.Power your inbox with Renewables Now's 4 free newsletters. Browse and subscribe for free.The overall hybrid project represents an investment of USD 320 million, including USD 219 million for the BESS, Engie Chile said.BESS Los Loros, located at the utility's Los Loros solar farm in the Atacama region, has 48 MW of maximum gross power and 275.23 MWh of storage capacity. The system, which represents an investment of USD 64 million, consists of 63 lithium-iron-phosphate battery containers.“Today, we are building the infrastructure needed for a new phase of the energy transition, where it is not enough simply to incorporate more renewable energy; we must also develop the capabilities to manage it efficiently and safely,” said Engie Chile CEO Juan Villavicencio.(USD 1.0 = EUR 0.862)
Engie Chile brings 251 MW of battery storage online
Chilean utility Engie Chile has started commercial operations at two battery energy storage systems (BESS) totalling 251 MW, taking its operational BESS capacity in the country to 663 MW.






