Guyana · ENERGY
Key Facts
—What happened A 1.5 MW portable generator arrived at Bosai’s Linden power house and installation is underway.
—How big a gap Peak demand has surpassed 15 MW, while maximum generation capacity stands at 14.5 MW.
—The real story Bosai agreed to add 3 MW in two engines, but only one is confirmed so far.









