Navigating the rush for AI capacity means staying ahead of the current. As developers race to secure large-scale power allocations, moving fast without the right utility and community partnerships creates costly delays down the line.

Developers have the most influence in our site selection strategy – finding the right power from the very beginning, identifying the right types of infrastructure requirements and bringing those ingredients together for a good solid power strategy is where we can shape the story the most.

Patrick Dillow, Rowan Digital Infrastructure

To truly redefine speed to power, a nimble approach to changing utility frameworks, supply chain bottlenecks, and local engagement is required.

In this DCD>Talk episode, Patrick Dillow, VP of energy and water at Rowan Digital, sits down to discuss what it takes to execute complex projects in the shifting landscape of energy.