NASA Administrator Jared Isaacman announces the Max Power event, an air and space expo that will take place across Space Florida’s Launch and Landing Facility at the Kennedy Space Center and the Kennedy Space Center Visitor Complex on Nov. 7-8, 2026. Image: Adam Bernstein/Spaceflight Now
NASA is potentially less than a year away from the trio of rocket launches that will encompass the Artemis 3 mission and the agency’s leader said he is “extremely confident” that the mission will happen in 2027.
Isaacman made the statement while joined by Brian Hughes, the Kennedy Space Center director, as well as members of the Florida congressional delegation on Friday. He was there to announce a new NASA-supported, privately run air and space show, called “Max Power” taking place in early November.
“I’m extremely confident that we are we are going to be able to launch Artemis 3 next year. That’s why we stepped into stacking operations,” Isaacman said, referring to the assembly of the Space Launch System (SLS) rocket happening in the Vehicle Assembly Building at KSC.
The left, with black stripe, and right aerodynamic forward assemblies for the twin SLS (Space Launch System) solid rocket boosters for Artemis 3 arrive at the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Thursday, Aug. 13, 2026. The nose cones will be integrated atop the SLS boosters to provide a smooth, pointed shape that allows the boosters to cut through the atmosphere efficiently, reducing drag and keeping the rocket stable during ascent. Image: NASA/Cory Huston






