Hope Uzodimma Was Here: One was in Owerri, Imo State recently and was pleasantly surprised that my favourite hotel now has adequate power supply. I have lodged intermittently in this serene, capacious facility since 2007.

That’s nearly 20 years.

But up until my last sojourn, the hotel was plagued with consistent electricity failure. Initially, it was power outages of the remorseless kind. It was as if a deranged kid in the power station was toying with the public power switch; flicking it off and on every ten minutes.

For instance, immediately there’s power failure and the hotel generator is switched on, public power is switched on again in a space of 5-10 minutes. This is like a vicious, cynical roulette. And this would go on for a whole day.

Indeed, it went on for over a decade. It was a most pernicious and unforgiving public work routine one ever experienced.