A staging-to-production data bleed cost me 4 hours of rollback. That's what finally made dry-run a structural requirement, not an afterthought.
The common advice is: test in staging, promote when green. The problem is environment drift. My D1 schema changes once or twice a week, and a solo operator can't keep staging perfectly synchronized. Worse, agents don't have fixed execution paths — the same input can produce a different tool call sequence on the next run. I ran a flow 100 times in staging and still hit a fresh path on the first production execution.
The most surprising thing I learned after 6 months of running this: latency wasn't the problem I expected. KV writes averaged 12ms — basically imperceptible. The real problem was that mock responses fool the agent into treating skipped writes as real successes. I'd dry-run an R2 put, the agent would believe the file was uploaded, and then proceed to write metadata to D1 — which was not in dry-run scope. Real write, orphaned record.
The fix: once any write tool in a run hits dry-run, propagate a flag for that runId that forces all subsequent writes in the same run to dry-run too.
// after intercepting first dry-run write